MPP Solar PIP-MS 1-5KVA Bedienungsanleitung Seite 1

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Netzteile und Wechselrichter MPP Solar PIP-MS 1-5KVA herunter. MPP Solar PIP-MS 1-5KVA User manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
1
1. Introduction
This inverter can be used in parallel with two different operation modes.
1. Parallel operation in single phase with up to 4 units. The supported maximum output
power is 16KW/20KVA.
2. Three units work together to support three-phase equipment, one inverter per phase.
The supported maximum output power is 12KW/15KVA.
NOTE: If this unit is bundled with share current cable and parallel cable, this inverter is
default supported parallel operation. You may skip section 3. If not, please purchase
parallel kit and install this unit by following instruction from professional technical
personnel in local dealer.
2. Package Contents
In parallel kit, you will find the following items in the package:
Parallel board Parallel communication cable Current sharing cable
3. Parallel board installation
This installation steps are only applied to 4K/5K models.
Step 1: Remove wire cover by unscrewing all screws.
Step 2: Remove communication board by unscrewing two screws as below chart.
PIP-HS/MS Series 4KVA/5KVA Parallel Installation
*Note: at the moment only 4048HS or 4048MS (both 5kva models) are offered this feature.
Seitenansicht 0
1 2 3 4 5 6 ... 11 12

Inhaltsverzeichnis

Seite 1 -

1 1. Introduction This inverter can be used in parallel with two different operation modes. 1. Parallel operation in single phase with up to 4 unit

Seite 2

10 84 AC input voltage and frequency detected different 85 AC output current unbalance 86 AC output mode setting is different 11. Commissioning P

Seite 3 - 5. Battery Connection

11 Support three-phase equipment Step 1: Check the following requirements before commissioning:  Correct wire connection  Ensure all breakers in

Seite 4 - BUS Bar

12 12. Trouble shooting Situation Solution Fault Code Fault Event Description 60 Current feedback into the inverter is detected. 1. Restart the inve

Seite 5 - 6. AC Input Connection

2 Step 3: Remove two screws as below chart and remove 2-pin and 14-pin cables. Take out the board under the communication board. Step 4: Remove two

Seite 6

3 Step 7: Put communication board back to the unit. Step 8: Put wire cover back to the unit. Now the inverter is providing parallel operation functi

Seite 7 - 8. PV Connection

4 Recommended battery capacity Inverter parallel numbers 2 3 4 Battery Capacity 400AH 600AH 800AH NOTE: Recommended spec of cable from inverter

Seite 8 - 9. Parallel Cable Connection

5 6. AC Input Connection Parallel in single phase Connect Line wires of AC input from each unit to Line BUS bar. Connect Neutral wires of AC input

Seite 9 - 10. LCD Setting and Display

6 WARNING: Only Line wires can be connected breaker. It’s not allowed to add breaker into Neutral wires between inverter and the BUS bar. All Neutral

Seite 10 - 11. Commissioning

7 WARNING: Only Line wires can be connected breaker. It’s not allowed to add breaker into Neutral wires. All Neutral wires are connected to the BUS

Seite 11

8 9. Parallel Cable Connection Parallel cable includes parallel communication cable and current sharing cable. Please follow below chart to connect t

Seite 12 - 12. Trouble shooting

9 10. LCD Setting and Display Setting Program: This setting is only available when the inverter is in standby mode (Switch off). Program Descriptio

Kommentare zu diesen Handbüchern

Keine Kommentare